Guide

How to hire a software development team, step by step

By Smartunex engineering team Published 7 min read

Short answer

Write down what the system has to do before you search, then talk to three to five teams and compare them on how they work, not on the first quote. Check references and work you can open yourself. Before a large contract, pay for one small, finished piece of work, and sign only once the agreement puts the code, the data and every account in your company's name.

Most hiring mistakes with a development team are made before the first line of code: the need was never written down, the quotes covered different work, and the contract said nothing about who owns what. This guide walks through the order we would follow ourselves if we were the buyer, from a page of notes to a signed agreement, with a small paid piece of work in between so you see the team deliver before you commit to it.

Write down what the system has to do for the business before you talk to any team. One page is enough: what the business does, who will use the system, what it must do on day one, what you use today, and any date that can’t move. If a site or system already exists, add who built it, where it is hosted and which accounts you can still log in to.

This page does two jobs. It lets every team quote the same thing, which is the only way their quotes become comparable. And it shows you quickly which teams read it: the good ones come back with questions about your business, not a generic proposal. Our guide on what to send a development team before the first call goes through it line by line, and our brief form asks the same questions.

Decide one more thing at this stage: what kind of team you need. A one-off brochure site, a shop with an order system behind it and a platform you will run for years call for different setups. If you aren’t sure, read agency, freelancer, in-house or a team first.

The steps at a glance

The whole process has seven steps, and each one should leave you holding something concrete.

Step What you do What you get
1. Write the need One page on the business, the users, the must-haves, current systems and the deadline A brief every team can quote against
2. Find candidates Ask people you trust, look at sites you like, search for teams that have built something close A long list of 8–10 names
3. Shortlist Send the brief, read the replies, drop anyone who answers with a template 3–5 teams worth a call
4. Compare A call with each, the same questions for all, quotes lined up item by item A clear view of how each team works
5. Check references and work Speak to past clients, open the live sites, ask what the team built and what it didn’t Evidence instead of a sales pitch
6. Paid pilot Buy one small, finished piece of work from your first choice A real deliverable, and a sense of the working relationship
7. Sign An agreement covering scope, billing, ownership, access and exit A contract you can leave without losing your system

Find candidates and cut them to a shortlist

The best leads usually come from people who run a business like yours and are happy with their team. Ask them what the team built, how it reports and what went wrong. A team that handled a problem well is a better sign than one with no problems on record.

Other good sources are the footer credits of sites you admire and the case pages of teams that have built something close to your system. Look for depth over breadth. A shop with a real back office behind it, or a site with online booking tied to a calendar, tells you more than twenty brochure sites.

Send your brief to eight to ten teams and read the replies before you book any calls. Keep a team on the list if its reply:

  • asks questions about your business you hadn’t thought to answer;
  • says plainly what it would build first and what it would leave out;
  • names who would do the work, by role;
  • explains how you would see progress and how billing works.

Then hold a call with each of the three to five that remain, and ask all of them the same questions. Our checklist of questions to ask a development agency before you sign is built for this step. Write the answers down straight after each call, because by the fourth call they start to merge.

When you compare quotes, put them side by side line by line. One quote might include testing, hosting setup and a handover. The other might cover the build and nothing else, so the lower number tells you nothing until the scopes match.

Check references and work you can see

Ask each finalist for two or three past clients you can speak to, and for live work you can open yourself. A reference call takes twenty minutes. Ask the client what the team was asked to build and how close the result came. Ask how changes to the scope were handled, how the team reported, and whether they would hire the team again.

For live work, open the site on your phone and on a laptop and try the main task it exists for: book a slot, find a product, ask for a quote. Then ask the team what exactly it built on that project. “We worked on it” can mean the whole system or one landing page. A team that shows you a whole system it built should be able to explain how the parts connect, in plain words.

If a team can’t share client names because of confidentiality agreements, that is normal for some work. Ask instead for a written description of what was built and a call with the person who led it.

Start with a small paid pilot

Before a large contract, pay your first-choice team for one small piece of work that is useful on its own. Good pilots are a single feature, one integration between two tools you already use, or a written assessment of an existing system with a plan of what to fix first. Keep it to a few weeks at most.

A pilot is smaller than a full discovery phase. The UK government’s service manual describes discovery as research into users and constraints before anything is built, and says around 4 to 8 weeks is typical (GOV.UK, page updated June 2021). A pilot can be part of that work, or something narrower. What matters is that it ends with something finished that you can check.

During the pilot, watch the things a contract can’t show you. Look at how the team asks questions, and how quickly it replies. Watch what its reports contain, and whether it tells you early when something will take longer. At the end you should hold the result in your own accounts: the code in your repository and the change live on your site, with a report of the hours that went into it. If the pilot goes badly, you have lost a few weeks and a small sum rather than a year.

What the signed agreement must cover

The agreement should say who owns the code, how billing works, how scope changes, and what happens when either side wants to stop. Ownership deserves the most attention. Under EU law, the employer gets the economic rights in software an employee writes on the job (Directive 2009/24/EC, Article 2(3)). That rule covers employees. An outside team is not your employee, so write the transfer of rights into the contract rather than assuming it.

Check that the agreement covers each of these:

  1. Ownership of the code, the data and every account, in your company’s name.
  2. Access: hosting, domain, repository and paid services registered to you, with the team working on access you grant.
  3. Billing: fixed price or hourly, what a report shows, and how often you get one.
  4. Scope changes: who can approve them and how they are priced.
  5. Testing and acceptance: what “done” means for each piece of work.
  6. Exit: notice period, what the team hands over, and help during a move to another team.

For comparison, this is how we set it up at Smartunex: you approve the scope before work starts, one hourly rate applies whatever the role, a weekly report shows every hour by role and task, and you own the code, the data and every account. Whatever team you pick, the website handover checklist is a good test of whether the exit clause works in practice.

Red flags

Any one of these is a reason to slow down; two or more is a reason to walk away.

  • The quote arrives before anyone has asked about your business.
  • The team won’t say who will do the work, or the people on the call disappear after signing.
  • Hosting, the domain or the repository would be registered to the team, “to keep things simple”.
  • No live work you can open, and no past client you can speak to.
  • Every answer is yes: no pushback on scope, no “this isn’t worth building yet”.
  • Billing is a single number with no breakdown, or hourly with no report of what the hours were spent on.
  • The contract is silent on ownership of the code or on what happens if you leave.
  • Pressure to sign this week for a discount.

What this guide doesn't cover

  • Which kind of team to hire. Agency, freelancer, in-house developer or a dedicated team is a separate decision, covered in its own guide.
  • What the work will cost. Budgets depend on scope; the cost guides for websites and web systems go through what drives the number.
  • Legal advice. The contract points here are what to ask for; a lawyer in your country should check the wording.

Questions owners ask

How many teams should I talk to?

Three to five is enough to see the difference in how they work. More than that and the calls start to blur together.

Should I pick the cheapest quote?

Not on price alone. Two quotes are only comparable when both cover the same scope, the same testing and the same handover, so line them up item by item first.

How big should the first paid piece of work be?

Small enough to finish in a few weeks and useful even if you stop there, such as one feature, an integration or a written assessment of an existing system.

Do I need to be technical to hire well?

No. You need to know what the system must do for the business, and to insist on plain-language scopes and reports. A team that can't explain its work to you without jargon will be hard to manage later.

Sources

  1. EUR-Lex — Directive 2009/24/EC on the legal protection of computer programs (accessed 2026-11-09)
  2. GOV.UK Service Manual — How the discovery phase works (accessed 2026-11-09)

Related work

Case · Auto service Car-service website A whole system rather than a brochure: online booking, quotes and prices kept in Google Sheets, the kind of scope this guide helps you write down and hire for.

See also

Start with a short brief

A few lines about your business and the system are enough for a first call. The call is free and there is no obligation.

We reply within one business day, usually within a few hours. No obligation.